SPE-GCS Continuing Education: Unconventional Well Production Using Hydraulic Jet Pump

Unconventional Well Production Using Hydraulic Jet Pump

 

  1. Jet Pump Downhole Equipment Configurations.
  2. Tubing String Installation Considerations.
  3. Surface Equipment Configurations.
  4. Surface Equipment Installation Considerations.
  5. Selection Process for Proper Nozzle/Throat Combination for the Frac Flow Back Process.
  6. Selection Process for Proper Nozzle/Throat Combination After the Frac Flow Back Process - Keeping Up with The Transient Productivity Index of the Well.
  7. Jet Pump Minimum Required Flowing Bottom Hole Pressure: How Low Can It Go?

Location: Newpark Drilling Fluids Office
21920 Merchants Way
Katy , Texas 77449

Date: June 14, 2018, 9 a.m. - June 14, 2018, 4 p.m.